An area of 11 hectares is planned for hazelnuts and almonds. Currently, 5 hectares are planted with melons and watermelons. The water source is a river located 350 meters from the planted area, with an elevation difference of 45 meters. Two SLAP 800 Lombardini pumps with a capacity of 1000 L/h have been installed. The execution time was 4 working days.